Levelone IES-0820 User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
IES-0820 User Manual Page 12
Connecting to Your Network
Cable Type & Length
It is necessary to follow the cable specifications below when connecting the switch to your
network. Use appropriate cables that meet your speed and cabling requirements.
Cable Specifications
Speed Connector Port Speed
Half/Full Duplex
Cable Max. Distance
10Base-T RJ-45 10/20 Mbps 2-pair UTP/STP Cat. 3, 4, 5 100 m
100Base-TX RJ-45 100/200 Mbps 2-pair UTP/STP Cat. 5 100 m
1000Base-T RJ-45 2000 Mbps 4-pair UTP/STP Cat. 5 100 m
100Base-FX ST, SC 200 Mbps MMF (62.5μm) 2 km
100Base-FX ST, SC 200 Mbps SMF (10μm) 20, 40, 75, 100 km
100Base-BX SC 200 Mbps MMF (62.5μm) 2, 5 km
100Base-BX SC 200 Mbps SMF (10μm) 20, 40 km
1000Base-SX SC 2000 Mbps MMF (62.5μm) 220 m, 2 km
1000Base-SX SC 2000 Mbps MMF (50μm) 550 m
1000Base-LX SC 2000 Mbps SMF (10μm) 10, 20, 50 km
1000Base-BX SC 2000 Mbps SMF (10μm) 20, 40 km
SFP
1000Base-SX Duplex LC 2000 Mbps MMF (62.5μm) 550 m, 2 km
1000Base-LX Duplex LC 2000 Mbps SMF (9μm) 10, 40, 60 km
1000Base-BX Duplex LC 2000 Mbps SMF (9μm) 70 km
Cabling
Step 1: First, ensure the power of the switch and end devices are turned off.
<Note> Always ensure that the power is off before any installation.
Step 2: Prepare cable with corresponding connectors for each type of port in use.
Step 3: Consult the previous section for cabling requirements based on connectors and
speed.
Step 4: Connect one end of the cable to the switch and the other end to a desired
device.
Step 5: Once the connections between two end devices are made successfully, turn on
the power and the switch is operational.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16

Comments to this Manuals

No comments