Levelone GES-0852 User Manual Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 29
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
6
The Front Panel
The front panel consists of LED indicators. Please refer to the following paragraph for
information.
LEDs Definition
System LED
The switch provides a power LED for the device.
LED
Status
Operation
Power
Steady Green
The switch is powered on
Off
The switch is powered off
Port LEDs
The switch provides one 1000MLED and one 10/100MLED for each port.
LED
Status
Operation
1000M
Green
The port is connected at 1000 Mbps
Blinking Green
A valid link is established, and there is data
transmitting/receiving.
Off
No valid link on this port or the Port is connected at 10/100
Mbps
10/100M
Steady Green
A valid link is established, and there is no data
transmitting/receiving.
Blinking Green
A valid link is established, and there is data
transmitting/receiving.
Off
No valid link on this port or the port is connected at 1000
Mbps
last RJ-45 (copper) port.
Page view 5
1 2 3 4 5 6 7 8 9 10 11 ... 28 29

Comments to this Manuals

No comments